KALA Residences: 3 Bedroom Townhouses in El Higuerón, Fuengirola

from €995,000

Overview

|
Property ID : RH-14728-property
Bedrooms
3
Bathrooms
3
Area
232 - 495 m2
Year Built
2028
Construction Status
Off-plan

Features

  • Gym
  • Co-working space
  • Security 24/7
  • Swimming Pool
  • Sea-views
  • Storage and Car Park

Description

KALA Residences – 3 Bedroom Townhouses in El Higuerón, Fuengirola

KALA Residences is a gated collection of 52 contemporary townhouses in Torreblanca del Sol, on the El Higuerón hillside between Málaga and Marbella. The houses are laid out over seven blocks that follow the slope, so the living areas and terraces face the sea. Every house has three bedrooms, a private garage and its own garden. The scheme is being built in two phases — 31 houses in the first, 21 in the second — and handover is scheduled for the fourth quarter of 2028. 24 houses are available, from 995,000 € + VAT.

Homes designed around light and views

Each townhouse is arranged over three levels. The basement holds the garage, a utility room and a multipurpose room that can become a gym, a study or a guest area. The ground floor is a single open living-kitchen space that opens onto a covered terrace and the garden. The first floor holds the three bedrooms and the bathrooms.
Built areas run from 171 m² to 230 m², with covered terraces of 18 to 20 m² and gardens and open terraces from 41 m² up to 245 m² — between 232 m² and 495 m² in total. Floors are large-format porcelain throughout, with non-slip porcelain on the terraces. Kitchens are fully fitted with a sintered stone worktop and top-range appliances.
Domestic hot water comes from a high-efficiency aerothermal system, heating and cooling from ducted air conditioning, and the bedroom floor also has hydronic underfloor heating. Each house carries photovoltaic panels serving the living and bedroom areas, a video entry system, and a pre-installation for electric vehicle charging in the basement.

Open-plan living room and kitchen at KALA Residences, Fuengirola

Resort-style communal areas

  • Adult and children’s swimming pools with saline treatment and shallow wet decks for sunbathing in the water
  • Gym and bio-gym areas
  • Integrated coworking spaces with natural light and connectivity
  • Quiet zones with ergonomic loungers, solarium areas and designer experience showers
  • Landscaped gardens designed to improve air quality and reduce heat
  • Private gated community with controlled access
Private garden and rear facade of a townhouse at KALA Residences, Fuengirola

Location and connections

KALA sits in the El Higuerón area of Fuengirola, one of the best-connected spots on the western Costa del Sol: the A-7 and the AP-7 are minutes away, the Carvajal and Torreblanca commuter rail stations link the coast to Málaga, and Málaga airport is a short drive. The beach is downhill from the development, and Marbella and Málaga are each roughly twenty minutes away.

Typologies and prices

Type Bedrooms Bathrooms Built area Covered terrace Garden and open terrace Available From
Townhouse with compact garden 3 3 171 – 182 m² 18 – 20 m² 41 – 76 m² 16 995.000 €
Townhouse with large garden 3 3 171 – 187 m² 18 – 20 m² 92 – 176 m² 7 1.150.000 €
Corner townhouse 3 3 230 m² 20 m² 245 m² 1 1.545.000 €

Prices VAT excluded, from the price list dated 10 August 2026, subject to availability and change.

Payment Plan

Stage Amount
Reservation 15.000 €
Private purchase contract 20% of the total price, VAT included, less the reservation
Deferred instalment 10% during construction
Completion Remaining 70%

Construction and delivery

The houses are sold off-plan, with handover of the first phase scheduled for the fourth quarter of 2028. The plans and specification in circulation are edition V3, dated 17 March 2026.
Ask us for the current availability list, the full specification and the plans of the houses that interest you, and we will send them over the same day.

Weighing up other options? Compare it with the other new developments in Fuengirola, side by side on price, delivery date and payment plan.

Floor Plans

Townhouse KA-03 — 3 bedrooms

171 m² built, plus an 18 m² covered terrace and a 61 m² garden. Basement with garage, utility and multipurpose room; open living-kitchen on the ground floor; three bedrooms above.

Bedrooms
3
Bathrooms
3
Size
171 m²
Townhouse KA-03 — 3 bedrooms

Townhouse KA-27 — 3 bedrooms

171 m² built, plus a covered terrace and a 41 m² garden. The most compact garden in the collection.

Bedrooms
3
Bathrooms
3
Size
171 m²
Townhouse KA-27 — 3 bedrooms

Townhouse KA-02 — 3 bedrooms

178 m² built, plus an 18 m² covered terrace and a 117 m² garden.

Bedrooms
3
Bathrooms
3
Size
178 m²
Townhouse KA-02 — 3 bedrooms

Townhouse KA-14 — 3 bedrooms

175 m² built, plus a covered terrace and a 142 m² garden.

Bedrooms
3
Bathrooms
3
Size
175 m²
Townhouse KA-14 — 3 bedrooms

Townhouse KA-31 — 3 bedrooms

183 m² built, plus a covered terrace and a 116 m² garden.

Bedrooms
3
Bathrooms
3
Size
183 m²
Townhouse KA-31 — 3 bedrooms

Corner townhouse KA-08 — 3 bedrooms

230 m² built, plus a 20 m² covered terrace and a 245 m² garden. The largest house on sale.

Bedrooms
3
Bathrooms
3
Size
230 m²
Corner townhouse KA-08 — 3 bedrooms

Site plan

Layout of the seven blocks, with the 31 houses of the first phase and the 21 of the second.

Site plan

Energy Performance

  • Energy Class: A
  • A+
  • A
  • B
  • C
  • D
  • E
  • F
  • G

Property on Map

Request Availability & Floor Plans

Schedule A Tour

Communal pool with sea views at KALA Residences, Fuengirola
Schedule a Viewing

Interested in this home? Arrange a tour today and get a closer look at its features, layout, and surroundings. Whether you choose an in-person visit or a video chat, our staff will be there to answer your questions and help you take the next step.

Similar Properties

Korall Residences Fuengirola: 3 Bedroom Sky Villas with Garden in El Higuerón

El Higuerón, 29640 Fuengirola, Málaga
3
2
130 - 138 m2

Veridian: 3 Bedroom Semi-Detached Homes in El Higuerón, Fuengirola

Calle Victoria Kent, El Higuerón, 29640 Fuengirola, Málaga, Spain
3
3
269 - 381 m2
2028

The Kos: Luxury Sky Villas in Fuengirola

Calle Paula, Fuengirola, Costa del Sol Occidental, Málaga, Andalucía, 29639, España
3-4
2-3
2026

Selected Partners

Taylor Wimpey logo
DarGlobal logo
Aedas Homes logo
Amenabar logo
Via Celere logo
Quabit logo
Kronos Homes logo

Marbella Investment Properties

Chat with us +34 644 286 307 Request Availability & Floor Plans